During construction, piles need to be driven underneath in order to ensure the stability of the building
So what are the requirements of the construction specifications for broken pile head? Let's have a look

1
The pile head can be broken only when the hardness of the concrete surface reaches certain conditions, and soft breaking, blasting and other methods cannot be used
2
The reinforcement shall not be damaged during ring cutting
After breaking, the pile top shall remain slightly convex
3
When the pile head is broken, the reinforcement protection measures shall be taken, and the reinforcement of the pile head shall not be bent
4
After the pile head is broken, no concrete shall be left on the pile top

What should we pay attention to in building piling
1
The construction personnel must do a good job in safety, wear safety protection tools during construction, and work with certificates

2
Before construction, the machinery shall be carefully inspected to see if there is any fault, and shall be repaired and maintained in time
During construction, the cables to be used shall be carefully checked to ensure safety before they can be used

3
Piling personnel on site shall also wear work cards, wear uniform clothes, and wear safety helmets to ensure safety

4
Guardrails shall be set around pile driving and obvious signs shall be made to prevent people from watching or approaching the construction site

5
If piling is required at night, the site lighting shall be sufficient to ensure construction safety
If the construction of pile hole is suspended, the surface shall be covered and obvious warning signs shall be made to prevent people from approaching

6
In case of water seepage from the shaft wall during pile driving, it must be drained in time

7
If the distance between pile foundations is relatively small, skip excavation shall be adopted, and the distance between pile holes shall not be less than 6m

8
If the depth of pile hole is more than 10m, air supply device shall be equipped, and air supply shall be started 5 minutes before construction
If there is toxic gas in the hole, conduct gas detection again after ventilation for a while

Summary: the above is about the requirements of the construction specifications for broken pile head
I hope it will be helpful to you! Pile driving needs to pay attention to many details, so you can refer to the above contents during construction

From: http://www
qlkgjgc
com
Contacts
Company Name
Jining Bangte Construction Engineering Co., Ltd
Name:
Mr. Manager Mao
Telephone
15106789955
Mobile
15106789955
Address
Operational Address
Da An Zhen An Qiu Fu Cun, Yanzhou District, Jining City, Shandong Province
Find Similar Products By Category
premiumexporter.com温馨提示

本网页所展示的有关【The broken pile head construction team tells you the requirements of the broken pile head constructi】的信息/图片/参数等由的会员【Jining Bangte Construction Engineering Co., Ltd】提供,由premiumexporter.com会员【Jining Bangte Construction Engineering Co., Ltd 】自行对信息/图片/参数等的真实性、准确性和合法性负责,本平台(本网站)仅提供展示服务,请谨慎交易,因交易而产生的法律关系及法律纠纷由您自行协商解决,本平台(本网站)对此不承担任何责任。您在本网页可以浏览【The broken pile head construction team tells you the requirements of the broken pile head constructi】有关的信息/图片/价格等及提供【The broken pile head construction team tells you the requirements of the broken pile head constructi】的商家公司简介、联系方式等信息。

在您的合法权益受到侵害时,请您致电,我们将竭诚为您服务,感谢您对premiumexporter.com的关注与支持!