Welcome !

Jilin Jijian Hengtong Steel Structure Construction Engineering Co., Ltd

企业会员1YEAR

Jilin Jijian Hengtong Steel Structure Construction Engineering Co., Ltd

Country:Nationwide,China

Business:Light steel structure, disassembly and assembly activity room, large warehouse, cold storage, scenic spot, residence, villa, hotel, supermarket and other col…

Supply Jilin steel structure warehouse

PriceCN ¥1.00

Brand
Ji Jian
Quantity
111 ƽ
Min. Order
1 ƽ
Country
JilinChangchun City,China
Recommended For You
品牌:
Ji Jian
  Jilin Jijian Hengtong Steel Structure Construction Co
, Ltd
has the qualification of general contracting of housing construction, steel structure design and construction engineering enterprise; Steel products processing, manufacturing and sales; Design and construction of steel structure curtain wall; Construction of grid structure works
In line with the concept of "for the sake of customers, creating * * projects and building the corporate image", we have done every steel structure, grid structure and cable membrane structure project with all our heart
Steel structure manufacturers around you &mdash& mdash; Jijian steel structure
order
Tel: 15046238111   13904332000 Ma Donglai  
1
welding process
This process is a concealed project and one of the processes prone to quality problems
According to the statistics of a company's product quality report in 2004, the weld repair rate caused by the welding quality is as high as 80%, followed by about 10% of the weld quality problems caused by the improper operation of the previous process and the technical problems of the operators
Such problems are the main problems that directly affect the project quality
Therefore, this type of problem * can only be detected and judged by a professional testing company using professional testing tools
Generally, it can be divided into slag inclusion, incomplete fusion, air hole, etc
according to the type of defects in the weld
Steel structure workshop, Jijian products browse website: http://www
myjijian
com/
 
2
painting process
This process is also a concealed process, and its impact on the structure is less than that on the building function
It is also a process prone to quality problems
The quality problems of the process mainly include: the paint film on the component surface falls off in a large area and partially, the paint film on the component surface falls off and sags, the thickness of the paint film is insufficient, the thickness distribution of the paint film is uneven, and the color difference of the paint film is large
Steel structure warehouse
3
setting out and blanking process
This process belongs to the "head" before component processing
Its quality has a direct impact on the next process, and even leads to the scrapping of all parts and components
This is very common
Therefore, it is very important to monitor the quality of the "head" process before cutting
; Batch parts scrapped due to mistakes in preparation of process documents; The cutting size * heavy * exceeds the standard requirements

4
assembly process
This process plays an important role in the quality of component processing, and its quality is greatly affected by the previous process, so it is important to strengthen the process monitoring before assembly
The quality problems caused by this process are mainly manifested in the following aspects: the position of assembled parts is wrong, for example, 3450mm is assembled into 4350mm; The use of parts and components is wrong
2\parts and components should have been assembled, but 3\; The parts and components are assembled incorrectly in the positive position
For example, the 45mm hole on the plate was originally outward, but the 45mm hole was actually installed inward; The assembly clearance of assembled parts * exceeds the requirements of specifications and technical documents, and the 3mm clearance is 7mm; Some parts are assembled without calibration, and the existing deformation after assembly cannot be eliminated; The operator saves time by cutting the hole position and size mark on the part; There is no surface treatment in the assembly and welding area; Assembly errors due to incorrect drawing dimensions

 
 
Contacts
Company Name
Jilin Jijian Hengtong Steel Structure Construction Engineering Co., Ltd
Name:
Mr. Ma Donglai
Q Q
3267601180
Telephone
0431-80809997
Mobile
13904332000
Address
Operational Address
Nine kilometers from Changbai highway, Hexin Town, Luyuan District
premiumexporter.com温馨提示

本网页所展示的有关【Supply Jilin steel structure warehouse】的信息/图片/参数等由的会员【Jilin Jijian Hengtong Steel Structure Construction Engineering Co., Ltd】提供,由premiumexporter.com会员【Jilin Jijian Hengtong Steel Structure Construction Engineering Co., Ltd 】自行对信息/图片/参数等的真实性、准确性和合法性负责,本平台(本网站)仅提供展示服务,请谨慎交易,因交易而产生的法律关系及法律纠纷由您自行协商解决,本平台(本网站)对此不承担任何责任。您在本网页可以浏览【Supply Jilin steel structure warehouse】有关的信息/图片/价格等及提供【Supply Jilin steel structure warehouse】的商家公司简介、联系方式等信息。

在您的合法权益受到侵害时,请您致电,我们将竭诚为您服务,感谢您对premiumexporter.com的关注与支持!