Small knowledge of parameters of gft-40 Metro special equipment for saddle railway hydraulic single track adjustment
If you don't want to be fooled by others and life, please control yourself
Whoever cannot control himself is a slave
Small knowledge of parameters of gft-40 Metro special equipment for hydraulic single track adjustment of saddle Railway
Working principle:
1
When increasing the rail gap (i
e
pushing the rail): the front clamp 1 and the middle clamp 5 are used, and the rear clamp 8 is not involved in the work
The hydraulic oil pressure is put into the double oil cylinder through four plunger pumps, and the piston 2 extends outward
After the inclined iron in the front and middle clamps the two rails, push the rails to increase the gap between the two rails, so as to achieve the purpose of adjusting the rail gap
2
When reducing the rail gap (i
e
pulling the rail): the middle clamp 5 and the rear clamp 8 are used, and the front clamp 1 is not involved in the work
The hydraulic oil pressure is put into the double oil cylinder through four plunger pumps, and the piston extends outward
After the inclined iron in the middle clamp and the rear clamp clamp the two steel rails through the pull rod 6, pull the steel rail to narrow the gap between the two steel rails, so as to achieve the purpose of adjusting the rail gap
Small knowledge of parameters of gft-40 Metro special equipment for hydraulic single track adjustment of saddle Railway
Toll free: 400-8723-668
Landline: 0412-4948789
Manager Zhang: 155-4275-3671
Website: www
lngwtl
com com
Saddle railway hydraulic single track adjustment gft-40 subway special equipment parameter knowledge saddle railway hydraulic single track adjustment gft-40 subway special equipment parameter knowledge
The rail gap adjuster is an important part of railway engineering Bridges Ideal rail cutting tool for line overhaul and other departments
The above is the detailed introduction of the rail cutting machine
If you don't understand, please call 400-8723-668
We will help you solve all the problems related to the rail cutting machine within 24 hours
Pre sales service:
1
The supplier is responsible for railway or automobile transportation
2
Arrive at the place of delivery according to the delivery time and method specified by the user;
3
The user shall conduct acceptance according to relevant product standards;
4
Do a good job in technical consultation and provide users with free technical training;
5
The quantity of spare parts is sufficient, the variety is complete, and the supply is guaranteed at any time
Contacts
- Company Name
- Liaoning public works Railway Equipment Factory
- Name:
- Ms. Manager Zhang manage
- Q Q
- 2943641093
- Telephone
- 0412-4948789
- Mobile
- 15542753675
Address
- Operational Address
- Anshan Industrial Park, Liaoning Province
Find Similar Products By Category
premiumexporter.com温馨提示
本网页所展示的有关【Small knowledge of parameters of gft-40 Metro special equipment for hydraulic single track adjustment of saddle Railway】的信息/图片/参数等由的会员【Liaoning public works Railway Equipment Factory】提供,由premiumexporter.com会员【Liaoning public works Railway Equipment Factory
】自行对信息/图片/参数等的真实性、准确性和合法性负责,本平台(本网站)仅提供展示服务,请谨慎交易,因交易而产生的法律关系及法律纠纷由您自行协商解决,本平台(本网站)对此不承担任何责任。您在本网页可以浏览【Small knowledge of parameters of gft-40 Metro special equipment for hydraulic single track adjustment of saddle Railway】有关的信息/图片/价格等及提供【Small knowledge of parameters of gft-40 Metro special equipment for hydraulic single track adjustment of saddle Railway】的商家公司简介、联系方式等信息。
在您的合法权益受到侵害时,请您致电,我们将竭诚为您服务,感谢您对premiumexporter.com的关注与支持!