Basement garage drainage board 135-6380-2394 basement top drainage board, roof planting drainage board, garage top drainage board, basement greening drainage board, plastic greening drainage board, parking lot drainage board supply, community greening drainage board, sale of underground garage drainage board, package welding package construction, plastic water guide board, plastic permeable board, plastic waterproof board Plastic root blocking board we specialize in the production of 0
8cm-5
0cm drainage board
Welcome to visit our factory
On site customization: Tai'an Chengyuan drainage engineering materials Co
, Ltd
is located in the development zone of youth entrepreneurship Park at the foot of beautiful Mount Tai
Sale of drainage board, water storage and drainage board, composite drainage board, geotextile, geomembrane, grass planting grid, grid, filament geotextile and polypropylene geotextile 135-6380-2394 manager Zhao
Underground garage drainage board laying needs: 135-6380-2394 manager Zhao details
(1) The construction of drainage board needs to understand the laying procedures of plastic drainage board
The laying of drainage board should be completed by professional construction personnel
The laying should follow the following procedures: first, sort out the waste and cement leveling on the laying site to ensure that the smoothness on the site is not significant
There are 2-5 & permil requirements for the drainage board of outdoor garage and roof garden; Slope making, so that the water discharged from the drainage board can be collected and discharged to the adjacent sewer
(2) Anti seepage on the ground of the basement: the floor is raised above the foundation, that is, a layer of plastic drainage board is made before the floor is made, the circular protrusion is downward, and a blind ditch is left nearby to ensure that the groundwater does not come up
The seepage naturally flows into the nearby blind ditch through the space of the drainage board, and the seepage finally flows into the sump through the blind ditch
(3) Water seepage prevention of basement wall: the specific operation is to lay plastic drainage board on the main wall of the building, with the round raised platform facing the main wall, build a single wall outside the drainage board, or use steel mesh powder cement to maintain the drainage board, so that the space of the water seepage board outside the wall flows straight down into the blind ditch and into the sump
Contacts
- Company Name
- Tai'an Chengyuan drainage engineering materials Co., Ltd
- Name:
- Ms. Zhao CHENHONG
- Q Q
- 2667601733
- Telephone
- 0538-6632127
- Mobile
- 13563802394
Address
- Operational Address
- Taian youth entrepreneurship Park Development Zone
Find Similar Products By Category
premiumexporter.com温馨提示
本网页所展示的有关【Sale of drainage board of underground garage and construction of welding package】的信息/图片/参数等由的会员【Tai'an Chengyuan drainage engineering materials Co., Ltd】提供,由premiumexporter.com会员【Tai'an Chengyuan drainage engineering materials Co., Ltd
】自行对信息/图片/参数等的真实性、准确性和合法性负责,本平台(本网站)仅提供展示服务,请谨慎交易,因交易而产生的法律关系及法律纠纷由您自行协商解决,本平台(本网站)对此不承担任何责任。您在本网页可以浏览【Sale of drainage board of underground garage and construction of welding package】有关的信息/图片/价格等及提供【Sale of drainage board of underground garage and construction of welding package】的商家公司简介、联系方式等信息。
在您的合法权益受到侵害时,请您致电,我们将竭诚为您服务,感谢您对premiumexporter.com的关注与支持!