Welcome !

Hebei xiangtian road and bridge transportation facilities Co., Ltd

企业会员1YEAR

Hebei xiangtian road and bridge transportation facilities Co., Ltd

Country:Nationwide,China

Business:Hardware fittings valve fittings bridge fittings bridge guardrail support cast iron road pier hand wheel bridge drain pipe high speed guardrail support melt …

PC curtain wall embedded parts hot galvanized embedded plate welding bench embedded bolts

PriceCN ¥9.00

Brand
Xiangtian road and Bridge
Quantity
666666
Min. Order
10
Country
HebeiCangzhou City,China
Recommended For You
品牌:
Xiangtian road and Bridge
  The process flow shall be processed according to the drawing → Measurement and positioning → Support → Placing bolts, embedded parts and temporary fixing → Retest and fixation
For measurement and positioning, the technician shall first get familiar with the drawings and carry out the technical disclosure of measurement, and then the full-time surveyor shall lead out the control line and elevation control line of embedded parts and bolts from the measurement control network according to the technical measurement requirements
The specific position shall be determined according to the center and elevation of the designed embedded anchor bolts and embedded parts

The fixed support shall be provided with a relative elevation point on the vertical pile of the fixed support
The bottom shall be reliably welded and completely separated from the formwork fixed frame, reinforcement fixed frame, etc
, and the fixed frame shall have sufficient rigidity and stability

After the bolt fixing frame is erected, the bolt installation shall first fix the center according to the positioning line, then adjust the elevation, and carry out temporary reinforcement according to the scheme requirements

After the fixing bolts and embedded parts are re measured and placed, the surveyor shall adjust and check the bolts and embedded parts again
After the inspection meets the specification requirements, the lower part of the bolts shall be firmly welded with the fixed frame
At the same time, the bolt fixing frame shall be strengthened by welding cross bridging in both vertical and horizontal directions

Contacts
Company Name
Hebei xiangtian road and bridge transportation facilities Co., Ltd
Name:
Mr. Wang Biao
Q Q
593371739
Telephone
16630766756
Mobile
16630766756
Address
Operational Address
Liuzhuang steel market, Botou City, Cangzhou City, Hebei Province
Find Similar Products By Category
premiumexporter.com温馨提示

本网页所展示的有关【PC curtain wall embedded parts hot galvanized embedded plate welding bench embedded bolts】的信息/图片/参数等由的会员【Hebei xiangtian road and bridge transportation facilities Co., Ltd】提供,由premiumexporter.com会员【Hebei xiangtian road and bridge transportation facilities Co., Ltd 】自行对信息/图片/参数等的真实性、准确性和合法性负责,本平台(本网站)仅提供展示服务,请谨慎交易,因交易而产生的法律关系及法律纠纷由您自行协商解决,本平台(本网站)对此不承担任何责任。您在本网页可以浏览【PC curtain wall embedded parts hot galvanized embedded plate welding bench embedded bolts】有关的信息/图片/价格等及提供【PC curtain wall embedded parts hot galvanized embedded plate welding bench embedded bolts】的商家公司简介、联系方式等信息。

在您的合法权益受到侵害时,请您致电,我们将竭诚为您服务,感谢您对premiumexporter.com的关注与支持!