Welcome !

Hebei xiangtian road and bridge transportation facilities Co., Ltd

企业会员1YEAR

Hebei xiangtian road and bridge transportation facilities Co., Ltd

Country:Nationwide,China

Business:Hardware fittings valve fittings bridge fittings bridge guardrail support cast iron road pier hand wheel bridge drain pipe high speed guardrail support melt …

Hot galvanized embedded steel plate building curtain wall accessories embedded iron plate for perforated Bridge

PriceCN ¥9.00

Brand
Xiangtian road and Bridge
Quantity
666666
Min. Order
10
Country
HebeiCangzhou City,China
Recommended For You
品牌:
Xiangtian road and Bridge
  Embedded parts (prefabricated embedded parts) are components pre installed (buried) in concealed works It refers to the components and fittings placed during the structural pouring, which are used for the overlapping of the superstructure
To facilitate the installation and fixation of external engineering equipment foundation
Most of the embedded parts are made of metal, such as steel bar or cast iron, or non-metallic rigid materials such as wood and plastic
Embedded parts are components with steel plates and anchor bars reserved in the structure, which are used to connect structural components or non structural components for fixed purposes
For example, it is used to fix the connectors for the post process (such as doors, windows, curtain walls, water pipes, gas pipes, etc
)
There are many connections between concrete structure and steel structure
Technical measures for embedded parts: 1
Before the installation of embedded bolts and embedded parts, technicians shall make a detailed disclosure to the construction team, and check the specification, quantity and diameter of bolts and embedded parts
2
When pouring concrete, the vibrating rod shall not collide with the fixed frame, and it is not allowed to pour concrete against bolts and embedded parts
3
After the completion of concrete pouring, the actual value and deviation of bolts shall be re measured in time, and records shall be made
Measures shall be taken to adjust those exceeding the allowable deviation until the design requirements are met
4
To prevent pollution or corrosion, the nuts of foundation bolts shall be wrapped with oil or other materials before and after concrete pouring
5
Before concrete pouring, the bolts and embedded parts shall be inspected and accepted by the supervisor and quality personnel, and the concrete can be poured only after they are confirmed to be qualified and signed
Keep the measurement task list and measurement result records

Contacts
Company Name
Hebei xiangtian road and bridge transportation facilities Co., Ltd
Name:
Mr. Wang Biao
Q Q
593371739
Telephone
16630766756
Mobile
16630766756
Address
Operational Address
Liuzhuang steel market, Botou City, Cangzhou City, Hebei Province
Find Similar Products By Category
premiumexporter.com温馨提示

本网页所展示的有关【Hot galvanized embedded steel plate building curtain wall accessories embedded iron plate for perforated Bridge】的信息/图片/参数等由的会员【Hebei xiangtian road and bridge transportation facilities Co., Ltd】提供,由premiumexporter.com会员【Hebei xiangtian road and bridge transportation facilities Co., Ltd 】自行对信息/图片/参数等的真实性、准确性和合法性负责,本平台(本网站)仅提供展示服务,请谨慎交易,因交易而产生的法律关系及法律纠纷由您自行协商解决,本平台(本网站)对此不承担任何责任。您在本网页可以浏览【Hot galvanized embedded steel plate building curtain wall accessories embedded iron plate for perforated Bridge】有关的信息/图片/价格等及提供【Hot galvanized embedded steel plate building curtain wall accessories embedded iron plate for perforated Bridge】的商家公司简介、联系方式等信息。

在您的合法权益受到侵害时,请您致电,我们将竭诚为您服务,感谢您对premiumexporter.com的关注与支持!