Construction instructions: 1
Clean up the garbage on the laying site and level it with cement
There is no obvious concave convex on the site
The roof of outdoor garage and roof garden need 2-5‰ Slope making; 2
Pave the cup-shaped mouth of the drainage board upward and buckle the perforations; 3
The drainage board is covered with geotextile, which is overlapped with each other for 10 ~ 20cm to prevent muddy water from passing through the geotextile and silting the storage and drainage system, resulting in poor drainage and reduced water storage; 4
Lay 10 ~ 20mm medium coarse sand on the geotextile to form an infiltration filter layer, which can prevent the loss of planting soil; 5
Cover with planting soil of appropriate thickness
6
The finished products of drainage boards shall be well protected
After the drainage board is paved, it shall not be allowed to directly push and transport trolleys on the drainage board
When transporting materials, wooden boards and berms shall be paved to ensure that the soil is filled with paving
Contacts
- Company Name
- Sichuan xuanyang New Material Co., Ltd
- Name:
- Mr. Manager Yao
- Q Q
- 317829845
- Telephone
- 400-028-2488
- Mobile
- 13908180686
Address
- Operational Address
- 412 Shangyang street, Dujiangyan Economic Development Zone, Sichuan
Find Similar Products By Category
premiumexporter.com温馨提示
本网页所展示的有关【Sichuan Chengdu water storage and drainage board manufacture】的信息/图片/参数等由的会员【Sichuan xuanyang New Material Co., Ltd】提供,由premiumexporter.com会员【Sichuan xuanyang New Material Co., Ltd
】自行对信息/图片/参数等的真实性、准确性和合法性负责,本平台(本网站)仅提供展示服务,请谨慎交易,因交易而产生的法律关系及法律纠纷由您自行协商解决,本平台(本网站)对此不承担任何责任。您在本网页可以浏览【Sichuan Chengdu water storage and drainage board manufacture】有关的信息/图片/价格等及提供【Sichuan Chengdu water storage and drainage board manufacture】的商家公司简介、联系方式等信息。
在您的合法权益受到侵害时,请您致电,我们将竭诚为您服务,感谢您对premiumexporter.com的关注与支持!