Hydraulic drilling machine manufacturer hydrologic engineering drilling machine grinding plate drilling machine manufacturer   Price of disc drill   Pictures of disc drill Model of disc drill   Parameters of disc drill Disc drill manufacturers sell well   Directly supplied by the disc drill manufacturer   300 meter deep grinding disc drill   Engineering well drilling rig
Spj-300 disc drill large diameter water well drill Hydrological engineering drilling rig
Product specification:
1、 Spj— Model 300 hydrologic drilling rig is powered by diesel engine, and it can also be driven by motor in areas with electric power
2、 This rig is a bulk rotary drilling rig, which is mainly used for Quaternary medium and fine-grained strata and general soft rock strata
The main uses are:
1
Exploration and general survey of hydrogeological conditions at the bottom;
2
Drilling wells with irrigation and industrial water;
3
Underground tunnel ventilation, bridge and other engineering drilling
3、 When the drilling rig is working, the mud flushing fluid (positive circulation) is used, and the rotary table rotates to drive the drilling tool to rotate
The winch system is used to realize decompression drilling, lifting and lowering of drilling tools, lowering of well pipes, impact sampling, vertical placement of drill towers, etc
The drill is equipped with a fine-tuning drilling mechanism and a mechanical drilling tool screwing and unloading device
IV technical parameters of spj-300 water well drilling rig
|
drilling diameter
| Φ 500mm -1500mm
|
drilling depth
| 50m-300m
|
maximum output torque
| 18KN/m
|
active drill pipe
| 108mm× 108mm× 4000mm
|
drill pipe
| φ 89mm× 4200mm,φ 127×& phi; 108× 4200mm
|
main winch lifting capacity  
| 30KN
|
auxiliary winch lifting capacity
| 20KN
|
diameter of through hole of rotary table
| 500mm
|
rotating speed of rotary table (positive and negative)
| 40、70、128r/min
|
vertical height of drill tower
| 8 6m
|
rig weight
| 6 5t
|
overall size
| 8400mm× 2050mm× 8000mm
|
drilling tower type A (for drilling), equipped with zx300 drilling platform (for engineering pile foundation)
|
this product is widely used in hydraulic engineering, pile foundation engineering, bridge engineering, etc
After sales service]:
The company is responsible for the maintenance of any product quality problems that occur naturally within one year from the date of purchase
[product transportation]:
The products of our company are delivered to a third party for transportation, so it is not guaranteed that the products will not be damaged during transportation
If the products are found damaged after arrival, please contact our company in time
“ Integrity ” It is the foundation of our foothold, “ Innovation ” Is the source of our survival, “ Convenient ” It is the direction of our efforts
User satisfaction is our great benefit, and user trust is our great achievement
Our products have passed the inspection of formal inspection institutions
Please do not question the product quality
Please install in strict accordance with the product instructions, and have professional electricians install and debug
Contact: Zhu Tao
Mobile: 15206753158
Wechat: 15206753158
Electricity Tel: 0537-2535596
QQ:2851087479
Fax: 0537-2670398
Online quotation is not allowed
Please call for specific product prices, and the actual quotation on the phone shall prevail
The freight is different according to the different delivery places designated by the customer, and the arrival time of the goods is slightly different according to the actual situation in the logistics transportation process
Due to different production batches and specific models, the above pictures are for reference only
For details, please contact our business personnel for specific verification