Welcome !

Jining Shanmei Mining Machinery Co., Ltd

企业会员1YEAR

Jining Shanmei Mining Machinery Co., Ltd

Country:Nationwide,China

Business:Rock electric drill, rock drill, crusher, anchor drill, air pick, coal electric drill, tamping machine, air shovel, coal drill pipe.

Manufacturer's direct selling guardrail pile drive

PriceInquire

Quantity
Min. Order
0
Country
ShandongJining City,China
Recommended For You
  Loader type guardrail pile driver is a product developed according to the market demand and its own mature technology
It is a new product integrating the functions of loading, piling, drilling and so on
Adopting the new design concept, elaborately developing the overall function and taking into account the design idea of structural modularization, and fully closing each wooden installation structure is more conducive to the rapid installation and transfer of products
It can be widely used in the pile hole drilling of road guardrails such as highways and highways
It adopts hydraulic machinery as transmission, stepless speed change, convenient displacement, fast piling speed, simple operation, more reasonable mechanical process, energy saving, high cost performance, compact structure, reasonable layout and good stability Use and safety warnings
Please read this manual before use
Do not replace the accessories of this product without permission
During replacement, you need to consult the manufacturer
If you replace the accessories and refit without permission, the after-sales problems have nothing to do with the factory
Guardrail pile driver is a kind of highway guardrail steel pipe pile pressing equipment
It adopts diesel power and full hydraulic mechanical transmission
It has the characteristics of light driving, high piling accuracy, durability, energy conservation and environmental protection
It is especially suitable for field engineering construction of highway guardrail installation, maintenance and emergency repair

Guardrail pile driver method / procedure
1
Check the mechanical system and hydraulic system, and start the diesel engine only after the water level and oil level of the diesel engine water tank are normal
Start working after 3 ~ 5 minutes of low-speed no-load operation

 
2
The chassis of the machine is driven by hydraulic motor, with hydraulic stepless speed regulation
Different travel speeds can be obtained by adjusting the diesel engine speed and oil supply (hand valve control)
The forward and backward handle of the combined valve is pushed forward as the chassis moves forward, and the backward handle is pulled as the chassis moves backward
The rest of the lower pressure arm lifting cylinder, the upper frame transverse cylinder, the column pitching cylinder and the jib telescopic cylinder are controlled by the combined valve handle
The forward push of the handle is the extension of the cylinder piston rod, and the backward pull is the retraction of the piston

 
3
After arriving at the site, check whether the column is not vertical
If it is not vertical, it can be adjusted by pitching oil cylinder (or inclined rod) and lateral screw
The inclined cables on both sides of the column shall be locked
The orientation of the column shall be observed at any time during pile driving displacement

 
4
Adjust the longitudinal position of the chassis and the transverse position of the column to make the column reach the calibrated orientation

5
Raise the hydraulic hammer to the top, put the lower part of the steel pipe pile on the pile position, align the upper part with the pile head at the lower part of the hydraulic hammer, press the steel pipe pile, and then open the hammer for driving
The pile head keeps pressure on the steel pipe pile until the steel pipe pile is driven to the specified size

6
Due to the poor working environment and large impact vibration of the machine, the dynamics of each part shall be observed at any time during operation
In case of abnormal sound or other abnormal phenomena, stop the machine at any time for inspection, and continue to use after troubleshooting
In case of leakage of hydraulic system joints or loose connecting parts, stop the machine for adjustment and fastening, and continue to use after it is normal

7
Before the end of each shift, the hydraulic hammer shall be lowered to the low position, and the oil cylinders and piston rods at other places shall be shortened
During distance transfer, the column shall remain tilted back

8
For the guardrail pile driver, the executive elements, accessories and accessories, and electrical parts shall be regularly inspected for the connection in the motor wiring part

 
 
 
 
Company
Borehole diameter mm110-200
Drilling depth M33
Impactor 110 / 150 , 110/150
Engine model 4904102
Engine power kw37  fifty-one
Left and right stroke mm400 , four hundred
The height of hammer head above the ground is m2 seventy-two point seven
Hydraulic system flow L / min80-110 , 80-110
Rated pressure of hydraulic system mpa16-18 , 16-18
Working flow of hydraulic hammer L / min40-70
40-70
Hammer rod diameter mm6868 / 75
Impact frequency bpm500-900 , 500-900
Overall dimension mm4000 * 2620 * 2700 , 4200 *2620*2700
 
 
 
Use and precautions of guardrail pile driver
1
Preparation before use of new machine
 
① Fill the diesel engine with special engine oil until the scale is set;
 
② Fill the diesel engine with antifreeze;
 
③ The hydraulic oil tank is filled with hm32 anti-wear hydraulic oil (HM46 anti-wear hydraulic oil is filled in summer or when the temperature is high)
After startup and circulation, it is supplemented appropriately according to the oil storage in the oil tank (after each oil cylinder is filled with hydraulic oil, the oil storage in the oil tank will be greatly reduced

 
④ Start the diesel engine for 3-5 minutes and check whether there is oil leakage at the oil pipe joint
If there is oil leakage, tighten the joint screws in time;
 
⑤ Be familiar with each action of each operating handle control equipment

2
Operation
① Start the diesel engine and run at no load for 3-5 minutes;
 
② After being familiar with the functions of each handle, carry out the actual operation of each handle gently and avoid excessive operation

 
③ After the upper slide is erected, install the fixing screws;
 
④ Keep the slideway vertical during operation;
 
⑤ When driving and pulling out the pile, the hammer head must be in the compaction state with the pile before hammering, and virtual hammering is prohibited;
 
⑥ After the equipment is completed, each oil cylinder shall be in the retracted state to facilitate the equipment to travel;
 
3
Precautions
① Nitrogen pressure must be kept at 9-14mpa;
② Ensure sufficient hydraulic oil
When the hydraulic oil is insufficient, the equipment cannot work normally and may not produce impact;
③ When the new engine works for 40-60 hours, replace the special engine oil for the diesel engine;
 
④ When working continuously for a long time, due to the high oil temperature (especially in summer), the hydraulic oil is easy to deteriorate, affecting the pressure of the hydraulic system
If the hydraulic oil is found to be deteriorated, it shall be replaced in time;
 
⑤ When the temperature is low, hm32 anti-wear hydraulic oil is used as the hydraulic oil, and when the temperature is high, HM46 anti-wear hydraulic oil is used;
 
⑥ Before each operation of the equipment, it shall run empty for 3-5 minutes to ensure that the air discharged by the hydraulic system and the engine are at normal operating temperature;
 
⑦ The equipment shall be operated gently to avoid excessive and excessive operation, especially when the upper slide is erected, the excessive operation will lead to the bending and deformation of the slide and make the equipment unable to work normally!
⑧ When driving and pulling out the pile, the hammer head and the pile must be in the compaction state, and it is forbidden to blow falsely, which will damage the piston of the hydraulic hammer;
 
⑨ Due to the large vibration of the machine during operation, it is necessary to often check whether each element of the hydraulic system has oil leakage;
Frequently check whether the electrical components are loose, and deal with the problems in time

Contacts
Company Name
Jining Shanmei Mining Machinery Co., Ltd
Name:
Ms. ʷŮʿ
Q Q
3226673784
Telephone
0537-2228783
Mobile
15563712823
Address
Operational Address
No. 30, Jinyu Road, Jining City
Find Similar Products By Category
premiumexporter.com温馨提示

本网页所展示的有关【Manufacturer's direct selling guardrail pile drive】的信息/图片/参数等由的会员【Jining Shanmei Mining Machinery Co., Ltd】提供,由premiumexporter.com会员【Jining Shanmei Mining Machinery Co., Ltd 】自行对信息/图片/参数等的真实性、准确性和合法性负责,本平台(本网站)仅提供展示服务,请谨慎交易,因交易而产生的法律关系及法律纠纷由您自行协商解决,本平台(本网站)对此不承担任何责任。您在本网页可以浏览【Manufacturer's direct selling guardrail pile drive】有关的信息/图片/价格等及提供【Manufacturer's direct selling guardrail pile drive】的商家公司简介、联系方式等信息。

在您的合法权益受到侵害时,请您致电,我们将竭诚为您服务,感谢您对premiumexporter.com的关注与支持!