Welcome !

Liaoning public works Railway Equipment Factory

企业会员1YEAR

Liaoning public works Railway Equipment Factory

Country:Nationwide,China

Business:Manufacturing, maintenance, sales and leasing of railway special mechanical equipment and accessories, petroleum machinery and accessories, electrical equipm…

Maintenance steps of nzg-31 drilling machine track equipment of Shaoguan saddle iron

PriceInquire

Brand
Saddle iron
Quantity
1000 ̨
Min. Order
1 ̨
Country
LiaoningAnshan City,China
Recommended For You
Top Selling
品牌:
Saddle iron
  No one will give you strength at any time
You can't even rely on your own shoulders, but your heart can give you strength at any time
You can carry all the difficulties on your shoulders
Believe in yourself, you are the next miracle!
Maintenance steps of nzg-31 drilling machine track equipment of Shaoguan saddle iron
Working principle
The internal combustion engine of nzg-31 drilling machine transmits power to the main shaft through clutch gear deceleration, and the main shaft drives the drill bit to rotate for drilling movement; At the same time, pull the feed handle to feed the spindle through the rack to achieve the purpose of drilling

Main technical parameters
1
Internal combustion engine model: honda gasoline engine GX35
2
Power of internal combustion engine: 1
2kW
3
No load speed: ≥ 270r/min
4
Drilling diameter: & phi; 36-Φ nine point eight
5
Drilling time: ≤ 40s
6
Overall mass (including handle): 17kg
7
Overall dimension: 650 & times; 230× two hundred and fifty
Operating procedures
Preparation before operation:
1
Installation of drill bit: according to the needs of field work, install φ 31 hollow bit or & phi; 13
5、φ 9
8 twist drill
The specific methods are as follows:
(1) this manual is for installation φ 31 hollow drill bit as an example, pull the feed handle ⑨ to the rearmost end in the direction of gasoline engine

(2) lift the clamping rocker arm ⑥ towards the gasoline engine

(3) lift the drilling machine, loosen the set screws at two places of the main shaft sleeve with a solid wrench or fingers, install the bit core into the bit, align the two flat places with the two set screws respectively, and add molybdenum disulfide grease into the sleeve to prevent rust
Then insert it into the spline shaft and close to the root of the spline shaft, and then tighten the set screw to complete the installation
The machine is delivered as φ 31 hollow bit, see attached figure:
(4) drill bit disassembly: lift the drilling machine according to the steps (1) and (2) above, rotate the bolt counterclockwise with a solid wrench, and take out the drill bit from the main shaft sleeve

(5) after the operation, the drill bit must be removed with the attached wrench (if the machine is damaged by other wrenches, the consequences will be borne), and the threaded hole must be coated with thin oil or antirust agent

2
Installation of positioning block:
Select the positioning block ⑩ with the same model as the given rail (this positioning block is a combined dual-purpose positioning block, i
e
43 and 50, 60 and 75 combination, marked with words 43, 50, 60 and 75 respectively
The number is close to one side of the rail to indicate which rail type to drill
Loosen the bolt on the side of the positioning block counterclockwise with a solid wrench
Take 60kg / m as an example, close the 60 pattern to one side of the rail, the positioning groove on the other side is close to the positioning gear of the fixture, and tighten the bolt clockwise
As shown in the figure:
  3
Use of water injection bucket:
Align the handle of nzg-31 drilling machine with the groove at the mouth of the water injection bucket and press it down to the root, rotate the handle counterclockwise until the pressure device is rotated out, fill the water injection bucket with coolant (to prevent the drill bit and the drilled rail hole from rusting), fill it with coolant and tighten it clockwise, then rotate it counterclockwise for a small angle, take it out of the groove at the mouth of the water injection bucket, and press the handle back and forth (pressurize the water injection bucket), Insert the water pipe into the oil pipe 3 in the fixture of the drilling machine, hold the water outlet valve handle of the water injection bucket, press the water valve down with your thumb and push it forward to open it
At this time, press down the drill bit core and confirm that the coolant flows out of the drill bit before proceeding to the next step

4
Introduction and installation of positioning ruler:
The positioning ruler and the positioning ruler are divided into 43 points and 50 points respectively
Each positioning ruler has three positioning grooves, which are processed according to the standard hole spacing of steel rail

Pull out the ruler locator of nzg-31 drilling machine backward, and insert the positioning ruler ⑤ into the clamp body under the first slot

5
Filling fuel and lubricating oil:
Fuel filling: first loosen the fuel tank cover, add more than 90# unleaded gasoline or ethanol gasoline inward, and then tighten the fuel tank cover,
Add lubricating oil: loosen the fuel tank cover first, add more than 90# unleaded gasoline or ethanol gasoline inward, and then tighten the fuel tank cover,
Filling lubricating oil: loosen the oil tank cover of the lubricating chamber first, add lubricating oil inward (sae10w & mdash; 30 gasoline engine lubricating oil is recommended when the ambient temperature is - 10 ~ 40 ℃, sae5w & mdash; 30 gasoline engine lubricating oil is recommended when the ambient temperature is 0 ~ - 30 ℃), and reach the scale mark of its scale
Do not add less or excessive lubricating oil, and tighten the oil tank cover
Press the carburetor storage bubble of gasoline engine with your fingers for several times, and wait until the carburetor storage bubble is filled with gasoline

6
Start the gasoline engine:
When the temperature of nzg-31 drilling machine is lower than 10 ℃, usually close the damper (lift it up), increase the throttle to 1 / 4, quickly pull the starting disc and slowly put it back
After the gasoline engine is started, slowly open the damper to the maximum (press it down), slowly increase the throttle and idle for 30 seconds
Check whether the transmission part is flexible, whether there is abnormal noise and whether the screw connection is loose
Press the gasoline engine stop button to prepare for drilling

Company name: Liaoning Gongwu Railway Equipment Manufacturing Co
, Ltd
Toll free: 400 - 8723 - 668
Landline: 0412 - 494 8789
Manager Zhang: 1555 - 4275 - 3675
Website: www
lngwtl
com com
The above is the detailed description of the rail drilling machine
If you don't understand anything, please contact the personnel of our company, and our company will help you solve all the problems of relevant products within 24 hours
Other types of drilling machines produced by Liaoning public works Railway Equipment Manufacturing Co
, Ltd
: special electrical drilling machine, internal combustion public works drilling machine, railway drilling machine, rail drilling machine, internal combustion drilling machine, internal combustion rail drilling machine, concrete rail drilling machine, sleeper bolt drilling machine, railway drilling machine, electric rail drilling machine, internal combustion rail drilling machine, track drilling machine, track drilling machine, track drilling machine Track and rail drilling machine, sleeper bolt drilling machine, wood sleeper drilling machine, manual wrench, concrete sleeper drilling machine, concrete bolt drilling machine, internal combustion vertical bolt drilling machine, electric drilling machine, electric drilling machine, imported drilling machine, rotabrook drilling machine, internal combustion wood sleeper drilling machine and bolt drilling machine

Contacts
Company Name
Liaoning public works Railway Equipment Factory
Name:
Ms. Manager Zhang manage
Q Q
2943641093
Telephone
0412-4948789
Mobile
15542753675
Address
Operational Address
Anshan Industrial Park, Liaoning Province
premiumexporter.com温馨提示

本网页所展示的有关【Maintenance steps of nzg-31 drilling machine track equipment of Shaoguan saddle iron】的信息/图片/参数等由的会员【Liaoning public works Railway Equipment Factory】提供,由premiumexporter.com会员【Liaoning public works Railway Equipment Factory 】自行对信息/图片/参数等的真实性、准确性和合法性负责,本平台(本网站)仅提供展示服务,请谨慎交易,因交易而产生的法律关系及法律纠纷由您自行协商解决,本平台(本网站)对此不承担任何责任。您在本网页可以浏览【Maintenance steps of nzg-31 drilling machine track equipment of Shaoguan saddle iron】有关的信息/图片/价格等及提供【Maintenance steps of nzg-31 drilling machine track equipment of Shaoguan saddle iron】的商家公司简介、联系方式等信息。

在您的合法权益受到侵害时,请您致电,我们将竭诚为您服务,感谢您对premiumexporter.com的关注与支持!