The heavy-duty cement wallboard installer uses the battery as the power source to drive the hydraulic device to move and support the partition board, which effectively solves the safety and labor intensity of workers in the installation work! The wallboard erector uses the battery as the power output and relies on the hydraulic power unit to generate high-pressure oil
The support of partition board is controlled by electronic valve button
The wallboard erector uses pneumatic tire to push and pull the moving mode
Rear wheel steering control and rear wheel brake design
The wallboard erector can support, transport, move and install the 85 degree inclined plane of the partition board
The light partition board installation machine is a wall board installation equipment on the construction site
It is widely used in factories, workshops, various buildings and other places
We should pay special attention to its safe operation
1
Operator requirements: the operator of the wall panel installation machine must have simple operation training
Do not use it if you are not familiar with the vehicle and have not operated the equipment; 2
Duties, obligations and responsibilities of the operator: the operator must be clear about his duties and be familiar with the contents of the relevant operation instructions
If the light partition board installer used is a walking control type, the operator must also wear safety shoes during operation; 3
Forbid unauthorized personnel to use: the operator shall be responsible for the installation machine during work
He must prevent unauthorized personnel from driving or manipulating the equipment
Overload use is strictly prohibited; 4
Faults and defects: in case of any fault or defect of the wall panel installation machine, the management personnel must be informed immediately
If the wall panel installation machine cannot be operated safely (for example, wheel wear or brake failure), it must be stopped until it is completely repaired; 5
Safe operation and environmental protection: the contents of the chapter of inspection and maintenance operation must be carried out depending on the time interval on the maintenance list; Note: it is not allowed to change the parts on the wall panel installation machine, especially the safety device, without permission
The operating speed of the vehicle must not be changed
All original spare parts have been inspected by the quality assurance department
In order to ensure the safety and reliability of the operation of the light partition board installer, only the spare parts of the manufacturer must be used
The replaced parts, such as oil and fuel, must be disposed of according to the corresponding environmental protection rules
The light partition board installation machine is easy to maintain
1
The DC pump station motor has no carbon brush and basically needs no maintenance, greatly reducing the maintenance cost
2
The controller self diagnosis system displays the fault code through the handheld unit, which is more convenient to solve the fault
3
The timer and electricity meter can display the electricity usage at any time, so as to inform the operator to charge at the right time
4
Battery side pull design, easy to open the box cover, convenient to add distilled water or electrolyte to the battery
Convenient maintenance and replacement, improve work efficiency
5
A wide range of battery sizes and capacities are available for users to choose according to their actual needs
6
The use of vertical motor makes the detection and maintenance of motor and brake direct and convenient, and the maintenance performance is much better than that of horizontal motor
Contacts
- Company Name
- Ningjin Yongle mechanical equipment manufacturing Co., Ltd
- Name:
- Mr. Zhouqingyu manage
- Q Q
- 2698612559
- Telephone
- 0534-7070608
- Mobile
- 13573497327
Address
- Operational Address
- Shiji Town Industrial Development Zone, Ningjin County, Dezhou City, Shandong Province (boguzhang)
Find Similar Products By Category