- 品牌:
- Exhaust gas detection of Beijing steam boile
This standard specifies the emission control requirements, monitoring, implementation and supervision of boiler air pollutants
This standard is applicable to the air pollutant emission management of power generation boilers, industrial boilers and gas-fired heating water heaters, as well as the air pollutant emission management of construction project environmental impact assessment, environmental protection engineering design, completion environmental protection acceptance and operation
Test items: (1) particulate matter (2) sulfur dioxide (3) ringermann blackness (4) nitrogen oxide test time: , Once a year, NOx (once a month) sampling points: Several chimneys, several points, boiler air pollutant emission limit: , Table 1: limits for air pollutant emission concentration of newly-built boilers: Pollutant projects new boilers before March 31, 2017 and new boilers from April 1, 2017 , Particulate matter (mg / SP) 55 Sulfur dioxide (mg / m3) 1010 , Nitrogen oxides (mg / m3) 8030 , Smoke blackness (ringerman, grade 1) , Table 2: emission concentration limits of air pollutants from in-service boilers: Pollutant project: inside the high pollution fuel no combustion zone and outside the high pollution fuel no combustion zone , From the date of implementation of the standard after April 1, 2017 , Particulate matter (mg / m3) 510 , Sulfur dioxide (mg / m3) 1020 , Nitrogen oxides (mg / m3) 80150 , Smoke blackness (ringerman, grade 1) grade 1 , Table 3: unorganized dust emission control limits of coal-fired boilers: Concentration limit of pollutant project (mg / m3) , Unorganized dust (concentration difference between monitoring point and upwind reference point) 0
2 , Requirements for pollutant sampling and monitoring: the boiler using enterprise shall establish the enterprise monitoring system, formulate the monitoring plan, carry out self-monitoring on the pollutant emission status and its impact on the surrounding environmental quality, keep the original monitoring records and publish the monitoring results in accordance with the relevant regulations
Boiler using enterprises shall design, build and maintain sampling ports, sampling test platforms and sewage outlet signs in accordance with the requirements of environmental monitoring management regulations and technical specifications
The sampling of waste gas discharged from the boiler shall be carried out at the specified pollutant emission monitoring position according to the type of pollutants to be monitored
If there is a waste gas treatment facility, it shall be monitored after the facility
The monitoring and sampling of air pollutants in the exhaust funnel shall be carried out in accordance with gb5468, GB / t16157 or HJ / t397
Steam boilers of 20t / h and above and hot water boilers of 14MW and above shall be equipped with automatic pollutant emission monitoring equipment, which shall be connected with the monitoring network of the environmental protection department, and ensure the normal operation of the equipment, in accordance with the provisions of relevant laws and the administrative measures for automatic monitoring of pollution sources
For the monitoring of air pollutants, the monitoring quality assurance and quality control shall be carried out in accordance with the requirements of HJ / t373
Contacts
- Company Name
- Beijing air inspection
- Name:
- Ms. Li Gong
- Q Q
- 3282131668
- Telephone
- 13522309329
- Mobile
- 13522309329
Address
- Operational Address
- Fengtai District, Beijing
Find Similar Products By Category
premiumexporter.com温馨提示
本网页所展示的有关【Beijing boiler exhaust gas emission detection】的信息/图片/参数等由的会员【Beijing air inspection】提供,由premiumexporter.com会员【Beijing air inspection
】自行对信息/图片/参数等的真实性、准确性和合法性负责,本平台(本网站)仅提供展示服务,请谨慎交易,因交易而产生的法律关系及法律纠纷由您自行协商解决,本平台(本网站)对此不承担任何责任。您在本网页可以浏览【Beijing boiler exhaust gas emission detection】有关的信息/图片/价格等及提供【Beijing boiler exhaust gas emission detection】的商家公司简介、联系方式等信息。
在您的合法权益受到侵害时,请您致电,我们将竭诚为您服务,感谢您对premiumexporter.com的关注与支持!