PremiumExporterPort handling systems, wharf equipment, traffic facilities, and heavy logistics hardware for RFQ-led export sourcing.
Submerged Arc Furnace Parts Electrode Collet T2 Purple Copper Tile Electrode Holder Copper Electrode
Electronics Industry

Submerged Arc Furnace Parts Electrode Collet T2 P | RFQ Sourcing Details

Electronics Industry · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryContainer Handling Parts
Unitset
Diameterof shell mm Φ3500 4 Electrode pitch circle
CategoryElectronics Industry
CategoryElectronics Industry
AvailabilityInquiry required
Updated2026-05-27

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Electronics Industry. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Melting Equipment Electrode holder for electric Arc Furnace Copper electrode clamp : The main function of the electrode chuck of the electric arc furnace and refining furnace is to hold the electrode and deliver the current.

It is an important part that affects the electrical parameters of the secondary circuit of the electric arc furnace, and it is also very important for the safe operation and production efficiency of the electric arc furnace.

Product Features :Electrode holder is made of forged copper billet or chrome zirconium copper as the material mechanically processed, with high electrical conductivity, oxidation resistance and mechanical strength, the safe operation of the electric arc furnace to improve the productivity, electrode holder using water-cooled structure, reduce energy loss and improve its own service life has a good effect.

1. Main technical parameters SN Description Unit Data 1 Rated capacity T 10t 2 Average tapping T 12t 3 Diameter of shell mm Φ3500 4 Electrode pitch circle diameter mm Φ800 5 Electrode diameter mm Φ350 6 Electrode travel stroke mm 2000 7 Electrode lifting speed(up/down) m/min 6/4 8 Max.

steel tapping angle (forward) 42° 9 Max. slag tapping angle (backward) 12° 10 Max. roof swivel angle 60° 11 Roof lifting stroke mm 400 12 Transformer capacity with water/oil cooler kVA 7000 13 Transformer primary voltage kV 10 14 Transformer tap (on-load tap changer) step 5 15 Cooling water circulating flow T/h 240 2.

Scope of Supply SN Item Qty Remark 1 Furnace body 1 set 2 Tilting mechanism 1 set 3 Water-cooled roof 1 set 4 Roof lifting & swivel mechanism 1 set 5 Conductive arms 1 set 6 Electrode lifting mechanism 1 set 7 Cooling water distributor 1 set 8 Hydraulic power pack 1 set Proportional valve and pump make: Parker 9 Short net 1 set 10 L.V.

Control system 1 set 11 PLC control system & HMI 1 set Siemens S MVA Furnace transformer with water/oil cooler 1 set 13 Compressed air device 1 set 14 10kV H.V.

switchboard 1 set 2) Civil works and design (Seller provides furnace foundation drawings and civil work requirements), embedded furnace foundation parts;3) Water supply and gas supply main inlet are laid to Seller's equipment connection point, H.V. inco

Submerged | Applications and Buyer Notes

Submerged is organized as a sourcing-ready Electronics Industry reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time qu

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Electronics IndustryBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.
Diameter
of shell mm Φ3500 4 Electrode pitch circleBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryContainer Handling Parts
Unitset
Diameterof shell mm Φ3500 4 Electrode pitch circle

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

PremiumExporter related sourcing paths

Related categories PremiumExporter related paths

Switchgear and Breakers

Filling and Sealing Machines

Switchgear and Breakers

Related solutions PremiumExporter related paths

PremiumExporter procurement phrases

PremiumExporter related product samples